75μm Synthetic Paper self-adhesive label material for General Standard, built on a Hot Melt and 80g White Glassine Liner. Supplied as jumbo roll or slit roll.
General Standard Synthetic Paper
| Product code | F7MG71 |
|---|---|
| Face material | 75μm Synthetic Paper |
| Adhesive | Hot Melt (GH503) |
| Liner | 80g White Glassine Liner |
| Finishing | Back Printing |
| Roll format | Jumbo roll / slit roll to order |
| Face weight | — |
|---|---|
| Face thickness | 75 μm |
| Liner weight | 80 g/㎡ |
| Liner thickness | 70 μm |
| Initial tack | ≥14 N |
| 90° peel | ≥7 N/25mm |
| Min. application temp. | 10 ℃ |
| Service temperature | -15–65 ℃ |
| Test method | FINAT FTM 9 (tack, ball method) / FTM 2 (90° peel); cross-checked to GB/T 4852 / GB/T 2792 |
| Test condition | 23±2 ℃ / 50±5 % RH |
| Not recommended for | PVC surfaces; full solid coverage, fine graphics |
The three functional layers of this item. Selecting on face stock alone is where most specification errors begin — the adhesive and liner decide how it behaves on your press.
Customer feedback: Regular Grade
Typical use:Hot Melt Adhesive · Regular Grade
Typical brief from the buyer:Regular Grade Label
This construction belongs to the General Standard application field and uses Synthetic Paper as its face stock.
| Unit price | US$0.358 / ㎡ |
|---|
| 500 ㎡ and above | US$0.358 / ㎡ |
|---|---|
| 2000 ㎡ and above | US$0.340 / ㎡ |
| 5000 ㎡ and above | US$0.329 / ㎡ |
Unit price above is at the minimum order quantity of 500 ㎡. Ex-works Guangzhou; confirmed against your roll format.
Same face material or same application field — useful when comparing adhesive and liner options.
F10050
100μm Pearl Synthetic Paper · Low-odor / Residue-free
36μm Clear PET Liner · No Back Printing
F80671
80μm PP Film · Standard
62g White Glassine Liner · Back Printing
F80681
80μm PP Film · Standard
Double-layer White Glassine Liner · Back Printing
F8LG31
75μm Synthetic Paper · Freezer-grade
62g White Glassine Liner · Back Printing
Send your substrate, line speed and roll format — we will confirm the construction and lead time.