80g Coated Paper self-adhesive label material for General Standard, built on a Hot Melt and 85g White PEK Liner. Supplied as jumbo roll or slit roll.
General Standard Copperplate Paper
| Product code | A7MP40 |
|---|---|
| Face material | 80g Coated Paper |
| Adhesive | Hot Melt (GH503) |
| Liner | 85g White PEK Liner |
| Finishing | No Back Printing |
| Roll format | Jumbo roll / slit roll to order |
| Face weight | 80 g/㎡ |
|---|---|
| Face thickness | 70 μm |
| Liner weight | 85 g/㎡ |
| Liner thickness | 100 μm |
| Initial tack | ≥17 N |
| 90° peel | ≥9 N/25mm |
| Min. application temp. | 10 ℃ |
| Service temperature | -15–65 ℃ |
| Test method | FINAT FTM 9 (tack, ball method) / FTM 2 (90° peel); cross-checked to GB/T 4852 / GB/T 2792 |
| Test condition | 23±2 ℃ / 50±5 % RH |
| Not recommended for | PVC surfaces; small diameters, irregular or squeezable bottles |
The three functional layers of this item. Selecting on face stock alone is where most specification errors begin — the adhesive and liner decide how it behaves on your press.
Customer feedback: Regular Size
Typical use:Hot Melt Adhesive · Regular Size
Typical brief from the buyer:Regular Size Label
This construction belongs to the General Standard application field and uses Copperplate Paper as its face stock.
| Unit price | US$0.328 / ㎡ |
|---|
| 500 ㎡ and above | US$0.328 / ㎡ |
|---|---|
| 2000 ㎡ and above | US$0.312 / ㎡ |
| 5000 ㎡ and above | US$0.302 / ㎡ |
Unit price above is at the minimum order quantity of 500 ㎡. Ex-works Guangzhou; confirmed against your roll format.
Same face material or same application field — useful when comparing adhesive and liner options.
AR0010
80g Premium Coated Paper · Removable
60g White Glassine Liner · No Back Printing
AR2111
80g Coated Paper · Low-tack Removable
62g White Glassine Liner · Back Printing
AR2110
80g Coated Paper · Low-tack Removable
60g White Glassine Liner · No Back Printing
A7HK11
80g Coated Paper · Medium-tack
80g White CCK Liner · Back Printing
Send your substrate, line speed and roll format — we will confirm the construction and lead time.